Preconditioning Chamber (Room)

Preconditioning room or preconditioning chamber is for preparation before products are being EO sterilized.

The products can be heated and humidified in the preconditioning chamber (room) before EO sterilization, ensuring the preconditioned products can effectively reach the preset temperature and relative humidity required by ISO11135, which can effectively shorten the heating and humidifying time of the products in the sterilizer and save energy consumption. A separate automatic control system controls the preconditioning chamber (room).

Aeration Chamber (Room)

Aeration room or aeration chamber is for degassing of products after EO sterilization.

After EO sterilization, the products can be degassed in the aeration chamber (room)  in accordance with ISO11135. It effectively accelerates the removal of residual gas emissions from the sterilized product, ensuring it can achieve the acceptable criteria. It saves energy consumption and improves the sterilizer's working efficiency. A separate automatic control system controls the aeration chamber (room).

Features of Our Preconditioning System and Aeration System

  • Preconditioning system and aeration system are optional equipment for the sterilization process.
  • Our professional engineers will advise you on the necessity and design of the preconditioning chamber (room) and aeration chamber (room).
  • Preconditioning chamber (room) reduces heating and humidifying time in the sterilizer and increases the sterilizer's efficiency.
  • Aeration chamber (room) accelerates the removal of residual EO from the product, making it ready more quickly for dispatch and use.
  • The equipment is precisely controlled according to preset parameters, fully automated, easy to operate, and energy-saving.

Primary Technical Parameters of Preconditioning

Inner chamber volume: 3/6/10/15/20/25/30...100m³, customize acceptable.

Chamber material : Stainless steel or color steel plate or earth built house

Preconditioning temperature: 0~60℃

Preconditioning humidity: 30~80% RH

Preconditioning time: 1~200 hrs

Heated air circulation times: >30 times/hr

Primary Technical Parameters of Aeration

Inner chamber volume: 3/6/10/15/20/25/30...300m³, customize acceptable.

Chamber material: Stainless steel or color steel plate or earth built house

Degassing temperature: 0-60℃

Degassing time: 1~200 hrs

Heated air circulation times: >30times/hr

Air change times (outer circulation): >60times/hr

To get a free consultation

Contact Us Now